Anteros
04-02-2007, 04:50 PM
Is there a way to record resource times in production (Integrate time reporting with OPM)
Diego79
04-03-2007, 04:54 PM
You could use the resource transaction window to enter actual usage for each of the resources used in batch steps.
Powered by vBulletin™ Version 4.1.2 Copyright © 2012 vBulletin Solutions, Inc. All rights reserved.